Springerville Solar Array Output for
4:04:31PM on 10/7/2008
This page refreshes approximately every two minutes
TEP currently has 4.6MW of solar at the Springerville Generating Station Solar System (SGSSS) in northeastern Arizona. This site generates enough electricity to power 727 homes annually. The SGSSS is the most productive photovoltaic array in Arizona. Check out how much energy it is producing today!
To learn more about TEP's renewable programs please review our 2007 Renewable Progress Report.
|
|
||||||||||||||||||||||||||||
CURRENT POWER OUTPUT
Present Power in Kilowatts
1413.456 kW (Actual)
5,000 kW Max Potential
1413.456 kW (Actual)
5,000 kW Max Potential
Present Solar insolation
450 W/M² (Actual)
1,250 W/M² Max Potential
450 W/M² (Actual)
1,250 W/M² Max Potential
CUMULATIVE ENERGY PRODUCTION
Today (kWh)
19018 kWh (Actual)
28500 kWh (Max Potential)
19018 kWh (Actual)
28500 kWh (Max Potential)
This Month (MWh)
103 MWh (Actual)
680 MWh (Monthly Goal)
103 MWh (Actual)
680 MWh (Monthly Goal)
This Year (MWh)
4514 MWh (Actual)
7,650 MWh (Annual Goal)
4514 MWh (Actual)
7,650 MWh (Annual Goal)
CURRENT METEOROLOGICAL DATA






